Asbestos

Asbestos

Project Management

  • Asbestos Identification Surveys
  • Asbestos Project Design / Specification Development
  • Contract / Bid Administration
  • Contractor Pre-Qualification Evaluation
  • Contractor Bid Walk-Through Coordination
  • Bid Evaluation / Selection
  • Turnkey Abatement Services

On-Site Services

  • Asbestos Air Monitoring
  • Asbestos Waste Management
  • Asbestos Awareness Training
  • Asbestos Abatement Oversight
  • 6-month periodic Asbestos Surveillance
  • 3-year asbestos Re-Inspection
  • Asbestos Inspection / Management Plan Program Review
  • Operation and Maintenance Plan Program Review
  • PCB Removal / Project Design / Monitoring

The following Asbestos containing materials can exist in your building:

  • Flooring Material
  • Pipe Insulation
  • Drywall and Joint Compound
  • Caulking, Adhesion, Mastic
  • Roofing Materials
  • Boiler Insulation Materials
  • Glue pods (ceiling, chalkboard,..)
  • Thermal System Insulation
  • Spray-On Fireproofing
  • Heat Treat Ovens
  • Duct Insulation
  • Siding Material
  • Vermiculite Attic Insulation
  • Ceiling Panels
  • Tank Insulation
  • Tranzite (tabletops, panels,..)
  • Fire Curtains/Stage Equipment
  • Acoustical Ceiling Materials

GOT ASBESTOS? ARE YOU BEING EXPOSED?

Look no further than TEK Environmental